Month: September 2011
Irene, Part II
In a previous post, I said that Hurricane Irene had not left much visible damage other than fallen tree branches. But I forgot to mention just how large one of the branches was. We were lucky in that it fell forward and got lodged in the upper branches of a neighboring tree rather than across the back fence and the power lines and highway adjacent to the fence.
Note: click on a picture to view a slide show with larger images.
Going Up, Part XVII
Construction is finished on the second McMansion to be built in our neighborhood. The final landscaping has been completed, as has the deck we mentioned in Going Up, Part XVI. As the builder said: “There’s only one more thing to be added for final completion; the Sold sign in the front yard.”
Another view of the house from the back yard. Notice the First McMansion in the background.
Here’s the first McMansion, which sits between our house and the second McMansion. It was built in 2006.
To put things in perspective, here’s a picture of our humble abode. Our total first floor square footage is probably not much more than that of the master bedroom suite of the newest McMansion, which includes the bedroom, a sitting area, a huge master bathroom, and a walk-in closet that is nearly as large as the bedrooms in our house.
This is the final entry for the second McMansion. But don’t be too surprised if we start another of our “Going Up” series of posts in the not too distant future.