Going Up, Part VI

And the beat goes on.  Or maybe should I should restate that as “and the sound of nail guns and gasoline-driven portable air compressors goes on!”

The neighborhood’s latest suburban renewal project is moving right along.  Here is a picture taken on April 1st.  The roof was covered with tar paper that day.

504stephen_20110401_01

Here are some pictures taken at the end of the work day on April 6th.  The first is a side view of the house.  Note that the house wrap is now in place.  I don’t remember the exact day it happened,  but as I recall, it took about 4 –5 hours to complete the wrapping.  And the windows are now in place too.   504stephen_20110406_01

And here’s a front view.  504stephen_20110406_02 

The next three pictures show the interior.  Although it’s not too visible in these pictures other than a few PVC and metal pipes lying around, work has begun on the plumbing and HVAC duct work.504stephen_20110406_03

This is a view looking towards the rear of the house.  Lots of windows!504stephen_20110406_04

Here’s another view showing more of the rear, including the rear door.504stephen_20110406_05

This picture was taken on April 9th.  The front door is in place as are the wooden forms for the front steps.  It is not too visible in this picture but a 6-foot fence is now in place along the left and back property lines.  And it matches the neighbor’s fence on the right side of their property.IMG_0009

That’s all for now.  More to come soon.