Going Up, Part VII

There has been a lot of rain this week, so not much progress has been made on the outside work.  The shingles were delivered this past Monday…and then the rains came.

504stephen_20110411_01

 504stephen_20110411_04

The interior construction is moving right along.  It looks like the interior framing is just about done and the wiring runs for the electrical system are beginning to appear.

504stephen_20110417_04

504stephen_20110417_06

This is the side door of the garage. Note the water faucet on the left.

504stephen_20110417_07

Finally, here is a view of the house as it stands today.  Although it has rained a lot this past week, the front steps and the roughed-in work for the front porch were completed.

504stephen_20110417_03

That’s all for now.  More to come soon.

Going Up, Part VI

And the beat goes on.  Or maybe should I should restate that as “and the sound of nail guns and gasoline-driven portable air compressors goes on!”

The neighborhood’s latest suburban renewal project is moving right along.  Here is a picture taken on April 1st.  The roof was covered with tar paper that day.

504stephen_20110401_01

Here are some pictures taken at the end of the work day on April 6th.  The first is a side view of the house.  Note that the house wrap is now in place.  I don’t remember the exact day it happened,  but as I recall, it took about 4 –5 hours to complete the wrapping.  And the windows are now in place too.   504stephen_20110406_01

And here’s a front view.  504stephen_20110406_02 

The next three pictures show the interior.  Although it’s not too visible in these pictures other than a few PVC and metal pipes lying around, work has begun on the plumbing and HVAC duct work.504stephen_20110406_03

This is a view looking towards the rear of the house.  Lots of windows!504stephen_20110406_04

Here’s another view showing more of the rear, including the rear door.504stephen_20110406_05

This picture was taken on April 9th.  The front door is in place as are the wooden forms for the front steps.  It is not too visible in this picture but a 6-foot fence is now in place along the left and back property lines.  And it matches the neighbor’s fence on the right side of their property.IMG_0009

That’s all for now.  More to come soon.

April 2011

The First of April is the day we remember what we are the other 364 days of the year. Let us be thankful for the fools. But for them the rest of us could not succeed. — Mark Twain

The 15th of April 18th of April is the day that I, along with a number of other fools, have to send way too much money to the US Government. — Me

And the 25th of April is ANZAC Day in Australia and New Zealand, and a number of other places in that part of the world..  I once had the honor of spending ANZAC Day in the Fortune of War

Going Up, Part V

The roof went up on March 30th.  It took about four hours to go from the fist crane lift to the roof as shown in the last picture.

March 26th

504stephen_110326_01

March 30th

504stephen_110330_01

504stephen_110330_05

Stay tuned, more to come…

736 Days

My bionic left hip is 736 days old today.  I usually walk at least four miles or more per day so guess I need to call the doctor’s office and see if I need go in for a 3000 mile checkup.  On the other hand, maybe I should just leave well enough alone as the hip is doing just fine.

Going Up, Part IV

Note: click your pointing device (usually a mouse) on the thumbnails below to view a full size image.

March 18th, 7:38 AM

I-Beams – unlike the McMansion that was built next door to me, the main support beams will be steel rather than composite wood.  You can also see the crew finishing up the water supply and sewer connections.

504stephen_110318_02

March 22nd, 11:08 AM

The following picture was taken during the positioning of support beams for the outer walls of the first floor.  They were anchored using bolts that were sunk into the concrete when the basement was poured.

504stephen_110323_07

March 22nd, 5:55 PM

The following pictures show the results of the carpentry work for the day.  I think there were four carpenters plus the crane operator working on site. 

504stephen_110323_10

Note the cutout for the basement stairway in the following picture.

504stephen_110323_11

I think this is where the utility hookups will be.

504stephen_110323_12

You can see a portion of an I-Beam in the following picture.

504stephen_110323_13

The site at the end of the work day.

504stephen_110323_09

March 23rd

The site at the end of the work day .

504stephen_110323_14

March 25th

The site at the end of the work day.

504stephen_110325_02

That’s all for this week.  More to come in future.