The rain this past week slowed down progress on the exterior. But, they did manage to get the roof shingled.
The Drywall was delivered on 22 April.
The interior work is moving right along. The wiring runs and roughed in switch, outlet and and lighting boxes are done.
The Drywall and Mud are ready to go.
The roughed-in plumbing is done.
The water heater and furnace are in place.
And dual Cat 5 runs for connection of phone, Internet, TV and other media have also been installed
And, in case you didn’t notice, all of the insulation has been installed too.
Here’s a picture of the exterior as of 24 April.
That’s all for now. More to follow later.