Going Up, Part XIII

Pouring the driveway01 July 2011 – A sign that the construction is just about done…the driveway is going in today.  I suspect it won’t be too much longer until the final grading of the site is done and the sod is laid down.

The finished drivewayHere is the finished product.  It took one work day from start to finish.  And by start I mean they had to tear up the existing driveway apron and adjacent sidewalk, haul away the debris and build the forms before pouring and finishing the concrete.