Going Up, Part XV

I realized that all  of exterior pictures I’ve taken show a front view of the house.  To remedy this oversight, here are a number of pictures taken on 24 July 2011 that show the sides and back of the house.  At the right in this view, you can see the roughed-in support waiting for somebody to build a deck in the future.

This view shows the entrance to the basement.   Note the two air conditioners that service different zones within the house. 

504stephen_20110724-3During the early construction phase, I wondered what purpose this hole next to the basement wall served.

504stephen_20110724-4I finally realized that it’s purpose is to let natural light into the basement.  This is advertised as a feature in the sales brochure.

504stephen_20110724-5This is a view of the landscaping in the front yard.

504stephen_20110724-6You know it’s getting close to completion when finishing touches such as the house number appear.

Going Up, Part XIV

18 July 2011 – The lot has been graded and the final landscaping is in progress.  Not much left to be done now other than find someone with $1,285,000 who is looking to buy a new house!

Going Up, Part XIII

Pouring the driveway01 July 2011 – A sign that the construction is just about done…the driveway is going in today.  I suspect it won’t be too much longer until the final grading of the site is done and the sod is laid down.

The finished drivewayHere is the finished product.  It took one work day from start to finish.  And by start I mean they had to tear up the existing driveway apron and adjacent sidewalk, haul away the debris and build the forms before pouring and finishing the concrete.

Going Up, Part XII

504stephen_2011_06_15_0215 June 2011 – They are putting a permanent patch over the hole that was dug to connect the house to the water, sewer and natural gas lines.  The red truck in the foreground belongs to the tile setters.  With 4.5 baths, the kitchen and a wet bar in the basement, guess there is a lot of tile setting to be done.

504stephen_2011_06_19_01This picture was taken on 19 June 2011. 

 

Going Up, Part XI

504stephen_2011_06_01_01This picture was taken 01 June 2011.  The house is now up for sale at a bargain price of $1,285,000.

504stephen_2011_06_01_02The dry stack stone work on the front porch continues on.  Maybe it will look impressive when it is finished, but at the time this picture was taken, the dry stack doesn’t look that appealing.  I would much prefer a finished grout-filled look myself.

Going Up, Part X

504stephen_20110522_03 The siding was completed this week.  It’s been raining quite a bit during the last two weeks, so it took a while to get the all the siding installed. 

I’ve not had the opportunity to get a look at the interior lately, but I do  know that the hardwood flooring and kitchen cabinets have been installed.

504stephen_20110522_05this is a close-up of the stone façade at the left of the garage door.  The stone work is meant to simulate dry-stone.  The stone veneer is attached to the vertical surface using mortar.  No mortar is used between the stones, thus giving the appearance that the stones are “dry-stacked.”  The following pictures illustrate this technique.

504stephen_20110522_09

504stephen_20110522_08

That’s it for now, more to come soon…