15 June 2011 – They are putting a permanent patch over the hole that was dug to connect the house to the water, sewer and natural gas lines. The red truck in the foreground belongs to the tile setters. With 4.5 baths, the kitchen and a wet bar in the basement, guess there is a lot of tile setting to be done.