There has been a lot of rain this week, so not much progress has been made on the outside work. The shingles were delivered this past Monday…and then the rains came.
The interior construction is moving right along. It looks like the interior framing is just about done and the wiring runs for the electrical system are beginning to appear.
This is the side door of the garage. Note the water faucet on the left.
Finally, here is a view of the house as it stands today. Although it has rained a lot this past week, the front steps and the roughed-in work for the front porch were completed.
That’s all for now. More to come soon.