we will no longer be able to show progress on the interior on a regular basis. The doors are now locked or blocked in some other fashion during non-working hours. The last time we saw the interior, all the wallboard had been installed and finished. And there were pallets of wood trim (baseboards, wainscoting, etc.) sitting on the floor waiting to be installed.
Work started this week on the stone veneer trim for the front porch. Other exterior finishing work completed this week included installation of the garage door.
The exterior as of May 7th.
That’s all for now, more to come soon.